24 Hour Construction.

| No Comments | No TrackBacks
Tempe_Streetcar_Construction_Stacy_Witbeck_Workers_Night_Railway_Frog_04.jpgRailway frog insertion.
Tempe_Streetcar_Construction_Stacy_Witbeck_Workers_Night_Railway_Frog_13.jpg Tempe_Streetcar_Construction_Stacy_Witbeck_Workers_Night_Railway_Frog_02.jpg

A different art handled with gloves.
Tempe_Streetcar_Construction_Stacy_Witbeck_Workers_Night_Railway_Frog_Phoenix_Art_Museum.jpg Tempe_Streetcar_Construction_Stacy_Witbeck_Workers_Night_Railway_Frog_01.jpg

No TrackBacks

TrackBack URL: https://franzkoeck.net/cgi-sys/cgiwrap/fakoeck/managed-mt/mt-tb.cgi/790

Leave a comment

Photography

About this Entry

This page contains a single entry by Franz Koeck published on December 25, 2019 7:51 PM.

Abstraction of Winter. was the previous entry in this blog.

Different Views. is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Categories

Monthly Archives

Pages

OpenID accepted here Learn more about OpenID

October 2024

Sun Mon Tue Wed Thu Fri Sat
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31    
Powered by Movable Type 4.38