A heat exchanger installation in the Subfab where our lab is located. (PCWS/R: Process Chilled Water Supply/Return)
Here a color version:
Here a color version:
TrackBack URL: https://franzkoeck.net/cgi-sys/cgiwrap/fakoeck/managed-mt/mt-tb.cgi/230
Find more photos in the gallery.
And recent photos here.
All Work © 2009-2019
This page contains a single entry by Franz Koeck published on September 22, 2012 12:39 AM.
On the Metro. was the previous entry in this blog.
Construction. is the next entry in this blog.
Find recent content on the main index or look in the archives to find all content.
Sun | Mon | Tue | Wed | Thu | Fri | Sat |
---|---|---|---|---|---|---|
1 | 2 | 3 | 4 | 5 | ||
6 | 7 | 8 | 9 | 10 | 11 | 12 |
13 | 14 | 15 | 16 | 17 | 18 | 19 |
20 | 21 | 22 | 23 | 24 | 25 | 26 |
27 | 28 | 29 | 30 | 31 |
Leave a comment